Rear Shock mounts have two positions, depending on droop desired. The frame has finally been completely welded with a MIG (wire feed) machine.  Note the numerous gussets at the tube junctions.  These came from A&A manufacturing, as did most of the brackets used on the frame. It took about 16 hours to weld the frame, including two close inspections and touch-up passes.

Back to construction menu

Back to website home page